WGI served as parking consultant and parking consultant during the programming, design, and construction of two parking facilities at Washington Dulles International Airport. Both facilities have a cast-in-place/post-tensioned structural system and five levels. The north flank parking garage has 4,740 spaces, and the west flank parking garage has 4,000 spaces.
Below-grade moving sidewalks and at-grade shuttle buses transport pedestrians between the parking structures and the terminal building.
Project Highlights
- The west flank parking garage was designed to accommodate a future Metrorail station for the airport
- Both structures are designed for future vertical and horizontal expansion