WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Water Treatment Plant 8 Lime Sludge Thickener Structural Rehabilitation

Client:
Palm Beach County Water Utilities Department
Market:
Water & Environment, Water & Wastewater Utility
Location:
Palm Beach County, Florida

Project Details

In November 2015, WGI was contacted by Palm Beach County Water Utility Department (PBCWUD) regarding a recently installed motor replacement for its lime sludge thickener basin. The installed motor induced vibrations into the existing support bridge, causing vibration amplitudes in the order of 4 to 8 inches. WGI immediately investigated the cause and damage to the thickener basin and support bridge and provided structural analysis and an assessment report with recommendations to PBCWUD.  

Following the report, WGI was engaged to provide structural design and construction drawings to retrofit the existing sludge thickener rake and motor support beams with enhanced support framing. The design and construction documents followed the design presented in the Structural Analysis and Assessment Report. The design transferred loading from the motor to independent structural frame support, relieving the existing tank from the dynamic loads of the thickener motor assembly and bridge while providing a direct load path for those loads into an independent foundation.

Project at a Glance

  • Water Treatment Plant 8 Lime Sludge Thickener Structural Rehabilitation — image 1
  • Water Treatment Plant 8 Lime Sludge Thickener Structural Rehabilitation — image 2
  • Water Treatment Plant 8 Lime Sludge Thickener Structural Rehabilitation — image 3

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.

Guided by Local Expertise