WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Post Tags

Open or Closed? Does My Parking Garage Require Exhaust?

“Is the parking garage open or closed?” This is, and should be, one of the first questions asked by MEP engineers when a project containing a parking garage is kicked off. Enclosed parking garages require significant design efforts from a mechanical and architectural perspective.

What The Code Says

The 2015 International Building Code outlines what defines an “open” parking garage in Section 406.5.2:
  • Exterior side of the structure shall have uniformly distributed openings on two or more sides
  • Area of these openings shall be at least 20% of the total perimeter wall area of each tier
  • Aggregate length of the openings shall be at least 40% of the perimeter of the tier (Exception: Not required if openings are uniformly distributed over two opposing sides of the building)
If these requirements are met, the garage is considered open is assumed to be naturally ventilated. If they are not, the garage is required to be mechanically ventilated. The requirements for ventilating an enclosed parking garage can vary depending on the jurisdiction. In Austin, they are outlined in the 2015 Uniform Mechanical Code. Table 403.7 indicates that the minimum exhaust rate for an enclosed parking garage is 0.75 cfm per square foot.

How To Make It Happen

This is usually accomplished with an exhaust fan on each floor of the garage. These systems are required to operate continuously unless they are designed to operate automatically upon detection of vehicle operation or the presence of occupants. This is usually accomplished by providing carbon monoxide detectors throughout the parking garage and interlocking the exhaust fan operation with the carbon monoxide detection system on each level of the parking garage. When carbon monoxide levels in the garage reach a specified level, the associated exhaust fan will be enabled. [caption id="attachment_33464" align="alignnone" width="550"]Sidewall Exhaust Fan Typical sidewall exhaust fan within enclosed parking garage.[/caption] The UMC also requires that parking garage exhaust be discharged at the building exterior. It must be 10 feet above grade, 10 feet from any openings into the building (including operable windows), and 10 feet from the property line. [caption id="attachment_33465" align="alignnone" width="500"]Exhaust Louvers Exhaust discharge louvers at the top of chase.[/caption]

Early Coordination Is Key

A chase must often be provided (especially in the case of underground parking garages) to allow the exhaust to discharge 10 feet above grade. Not only must the chase be sized for the exhaust airflow, but it also must be able to accommodate the louvers at the discharge point, which can often be very large. It is critical, therefore, that coordination happen early in the design process as this can have a significant impact on the overall building design. Enclosed parking garages require a significant design effort but headaches can be avoided with some early coordination.

You need MEP Engineers who know the importance of early and continuous coordination to ensure successful projects. Contact Us today and let's discuss your next project!