This project involved signal improvements at seven intersections; the retrofit and reconstruction of existing sidewalks and curb ramps for ADA compliance, including the connection of sidewalk gaps for pedestrian path continuity; access management analysis of business parking encroaching into right-of-way; pedestrian safety improvements at several signalized intersections; subsurface utility engineering and utility coordination; and bus transit coordination with Pinellas Suncoast Transit Authority. Surveys included GPS, horizontal and vertical control, control aerial targets for fixed-wing photography, laser scanning at the intersection, re-establishing the project alignment, reference project alignment, jurisdictional line, drainage, section, and subdivision monumentation surveys. The preparation of a right-of-way control survey map was also included.