WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Basin Drive Stormwater Pump Station Rehabilitation City of Delray Beach

Client:
City of Delray Beach
Market:
Water & Environment
Location:
Delray Beach, FL

Project Details

The Basin Drive stormwater pump station is located in Delray Beach, Florida. This is a 3,000gpm stormwater flood control pump station owned and operated by the City of Delray Beach. The Basin Drive coastal residential area suffers from periodic inundation caused by a combination of an undersized stormwater management system and the effect of Sea Level Rise. During a 2016 King Tide, Intracoastal Waterway water spilled over the seawall and into the Basin Drive area. WGI performed an evaluation of the stormwater pump station, and associated drainage basin storm sewer collection system, and prepared a summary report detailing the results of the evaluation. The evaluation included a review of regulatory permit conditions, City objectives, field data collection (LiDAR survey), hydraulic and hydrologic (H&H) modeling, and a functional assessment of the pump station components. A pump integrity assessment was performed to identify mechanical, structural, and hydraulic deficiencies, including a Sea Level Rise H&H modeling study to quantify flooding caused by increasing SLR. The technical evaluation report included a description of the system deficiencies, recommended upgrades, preparation of conceptual level upgrade design, and preparation of an engineer’s opinion of probable construction costs. 

Project at a Glance

  • Basin Drive Stormwater Pump Station Rehabilitation City of Delray Beach — image 1
  • Basin Drive Stormwater Pump Station Rehabilitation City of Delray Beach — image 2

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.