This Design-Build project involves the replacement of the existing Flagler Memorial Bridge with a new 4-lane divided urban section bridge, which connects the Town of Palm Beach and the City of West Palm Beach. Traffic barrier-separated sidewalks will be included along both sides of the new bridge with a pedestrian/bicycle railing on the outside of the sidewalks. Additionally, the existing bridge overpass at Flagler Drive and SR A1A will be eliminated and replaced with an at-grade signalized intersection. This will necessitate reconstruction of portions of Flagler Drive from 4th Street to north of 7th Street. The project also includes drainage improvements, signing and pavement markings, bridge/roadway lighting, signalization/communication systems, structural/architectural components for a new bridgetender house, landscaping/irrigation, and utility services. WGI services included signalization/communication systems, utility coordination, and utility design services for the City of West Palm Beach.