WGI provided traffic control plan design, quality control reviews, and design surveys for this project, including widening, milling and resurfacing, and reconstruction of Florida’s Turnpike from four to six lanes for approximately seven miles. Improvements also included ramp modifications at the Boynton Beach interchange and bridge widening and reconstruction at the L-30 and Boynton Beach Canal crossings.
Design survey efforts completed by WGI included locating all underground utilities using subsurface utility engineering (SUE) techniques. SUE work included 100- foot interval locates on two high pressure regional transmission gas lines. Surveys included GPS control, bench levels, aerial targets for fixed-wing and LAMP, bridge surveys, channel surveys, drainage surveys, and right-of-way maps.