This project consisted of the extension of Jog Road from SR 710 (Beeline Highway) to Northlake Boulevard, approximately 0.7 miles. This new section of Jog Road is a 2-lane divided roadway with provisions for a future ultimate 4-lane divided urban roadway.
WGI’s efforts included: typical roadway sections, horizontal and vertical alignments, closed drainage conveyance systems, use of existing storm water management facilities, permitting through multiple agencies, extensive environmental research as part of an avoidance minimization effort, utility coordination, and signal modifications.
Other services included: the milling and resurfacing of portions of SR 710 and Northlake Boulevard; signalization and turn lane improvements at the intersections of SR 710 and Jog Road and Jog Road and Northlake Boulevard; and the realignment design of the Turnpike Connector Road.