As part of more than $1.1B in airport construction through 2019, WGI is partnering with Middlesex Corporation and the Greater Orlando Aviation Authority (GOAA) on this taxiway rehabilitation and safety enhancement project at Orlando International Airport. The project’s components include full-depth milling and resurfacing of 12,000 feet of Taxiways E and J, airfield lighting and signage replacement, and operational safety improvements on Airside Areas 1 and 2.
WGI’s services include terrestrial mobile LiDAR collection and imagery documentation of preconstruction conditions, earthwork modeling, field survey support of the construction operation, and as-built surveys using static terrestrial LiDAR.