WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Port St. Lucie Blvd. from Becker Road to Paar Drive

Client:
R.J. Behar & Company, Inc.
Market:
Transportation, Highways, Roadways & Bridges
Location:
Port St. Lucie, Florida

Project Details

In an effort to address an increasing volume of traffic, the Florida Department of Transportation (FDOT) is reconstructing Port St. Lucie Boulevard from South Becker Road to South of Paar Drive, a project length of just over one mile. Design began in 2020, and reconstruction efforts are ongoing. Efforts include adding lanes (from a two-lane rural section to a four-lane urban curb and gutter section) and adding a shared-use path on both sides of the roadway. FDOT is also reconstructing the existing bridge over East-84 Canal. To provide increased safety in the vicinity of the Nau Campus elementary school, the addition of a signalized intersection is planned at SW Gig Place.

WGI provided a full design survey in support of aerial photogrammetry and performed a control survey, setting 62 aerial targets due to the extension of side street surveying required. While performing data collection outside the paved areas and the subsurface utility engineering (SUE) designation, field crews simultaneously located property corners to establish the right-of-way and to create the baseline of the survey.

WGI coordinated closely with the engineer and aerial consultant due to the technical deliverables and the significantly compressed schedule. WGI leveraged multiple data collection technologies, including robotic total stations, ground-penetrating radar (GPR) for conducting underground utility location and designations, vacuum excavation equipment for verification of subsurface utility locations, static global navigation satellite system (GNSS) observations (geodetic control for the project), and other surveying services for successful on-time delivery of the project.

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.

Guided by Local Expertise