This project consisted of roadway widening and sidewalk construction to improve pedestrian and bicyclist continuity along Prospect Road from SR 7 to SR 870/ Commercial Boulevard in Broward County. This was an off-system project aimed at improving access to transit facilities on SR 7 as recommended in the SR 7 Multimodal Improvements Corridor Study completed by the Broward Metropolitan Planning Organization. The improvements included roadway widening along Prospect Road to provide for buffered bicycle lanes. Services for this project included roadway widening, drainage engineering, landscape architecture, miscellaneous structures, utility coordination, environmental permitting, surveying, subsurface utility exploration, geotechnical exploration, and public involvement.
Project Highlights:
• This was an off-system project aimed at improving access to transit facilities on SR 7 as recommended in the SR 7 Multimodal Improvements Corridor Study completed by the Broward Metropolitan Planning Organization.