WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

State of Michigan Ottawa Plaza

Client:
State of Michigan
Market:
Parking
Location:
Lansing, MI

Project Details

The State of Michigan Ottawa Building Complex was built in 1980. It consisted of an elevated landscaped area and two below-grade parking levels- one supported parking level and one slab-on-grade parking level. The supported parking slabs’ structural system typically consists of a structural steel beam and column framing with conventionally reinforced cast-in-place concrete slabs. The original 88,000-square-foot plaza surface included tree wells penetrating through the structural slab and surface plantings above the membrane. 

The parking structure had been exposed to chloride contamination from road salts and moisture that have progressively deteriorated the supported slab’s structural integrity and durability. WGI designed a full slab replacement including new lighting, fire protection, plumbing; new paint throughout; a heavy-duty low-odor deck coating system; new traffic control equipment; and new signage. 

A new plaza system, including a completely new membrane system, subsurface drainage isolation layer, cast-in-place floating slab, brick paving with an insulation layer, and snow melting system, was installed. The restoration included structural reconfiguration of specific deep well planters to become new walking areas and the installation of a complete subsurface drainage system to eliminate internal/subsurface water ponding. 

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.