WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Post Tags

Construction Update: Palm Beach Yacht Club Breakwater

The Palm Beach Yacht Club is a very unique marina that features multiple facilities including a restaurant and corporate offices on the Intracoastal Waterway. The Club was chartered in 1911 and is currently the oldest business establishment in West Palm Beach. The existing breakwater was installed to protect the boats moored at the Yacht Club Marina, but it has deteriorated beyond its usable life span. Breakwater system materials are installed while surrounded by water and must dissipate forces without stopping the water flow completely, unlike seawalls. Palm Beach Yacht Club Breakwater WGI developed a unique solution to this problem by installing custom prestressed concrete king piles with keyways that allow the concrete sheet panels to fit between the piles, securing the panels without fixing them to the concrete cap. This approach allows the water to flow through the sheet panels while stopping the wave forces from reaching the boats. WGI also utilized high strength concrete and galvanized reinforcing to extend the life of the new breakwater. Palm Beach Yacht Club Breakwater The contractor is driving piles and casting the breakwater in sections to allow his barge to act as a breakwater and protect the yacht club boats while the existing breakwater is being removed. The project is approximately 50% complete and is expected to be completed in June of 2019. Palm Beach Yacht Club Breakwater