Got Muck?

Sometimes the best “tool in the toolbox” is to leave some of the muck right where it is, especially if onsite wetland preservation is needed.

The scarcity of Florida’s buildable land has developers turning to parcels they previously passed over because they contained thick layers of muck. Muck (wet, sticky soil made from decaying plant material) presents several challenges for developers, including:

  1. it normally indicates a wetland is present that needs permitting and mitigation,
  2. it is geotechnically unsuitable for building upon, and
  3. it can contain arsenic in concentrations above residential standards.

In this article, we will specifically address the arsenic problem.

Arsenic is typically present in muck for a combination of reasons; some natural and some anthropogenic (human-caused). A primary source of anthropogenic arsenic is the use of herbicides like monosodium methyl arsenate (MSMA). An important first step is to determine what portion is naturally occurring and what portion is anthropogenic.  Although any arsenic above cleanup target levels needs to be managed to protect human health, if it is naturally occurring, arsenic generally can be managed safely onsite without the need for deed restrictions (which can lower property values). A well-crafted soil sampling plan and some statistics can usually distinguish naturally occurring arsenic from anthropogenic arsenic.

During arsenic cleanup, another crucial step is matching the cleanup strategy with the project’s desired end result. A single development project may have multiple land uses:  single-family residential, commercial, open recreational space, assisted-living facility, conservation easement, etc. Each of these land uses may have a different cleanup target level for arsenic. The most cost-effective remedial strategy will typically address each future land use separately.

WGI Environmental

Before WGI proposes a remedial plan for arsenic, we meet with the developer (including the geotechnical engineer and the general contractor) to understand what earthwork needs to occur regardless of any arsenic remediation. What lakes need to be dug? How much soil needs to be imported or exported for grading and flood control? What earthwork needs to occur to create geotechnically stable subsoils? Then we develop a cost-effective remedial plan that incorporates the earthwork that needs to get done anyway for other site development purposes.

If active arsenic remediation is needed, WGI has a range of effective tools. In some cases, removal and offsite disposal of some “hot spots” are the most economical, followed by soil blending of the remaining muck with soil that has lower concentrations. One of our most common solutions is to over-excavate a lake (especially if the development needs a source of clean fill material) and place the muck in the bottom of the lake. A key consideration here, however, is to test the soil using the Synthetic Precipitation Leaching Procedure to ensure the arsenic will not leach out of the muck and contaminate the groundwater. Also, the environmental regulatory agencies require a comprehensive water quality assessment, including pre-construction (baseline) monitoring wells, to compare to post-construction conditions. Sometimes the best “tool in the toolbox” is to leave some of the muck right where it is, especially if onsite wetland preservation is needed. Our extensive experience shows the most cost-effective solution uses multiple tools from that toolbox.

Share this post

Share this post

Learn more
about our
services

Related

Blog

Project Spotlight: Republic Tower

Discover how WGI helped bring The Republic Tower to life in downtown Austin, TX, delivering integrated infrastructure and permitting solutions for a landmark high-rise development that connects modern workplace design with one of the city’s most historic public spaces.

Awards

WGI Receives ACEC Florida Outstanding Special Project Award for FDOT Outdoor Advertising Program

WGI is proud to receive the 2026 ACEC Florida Outstanding Special Project Award for our work supporting the Florida Department of Transportation’s Outdoor Advertising Program. Through the innovative use of lidar and geospatial technology, WGI is helping modernize billboard compliance and corridor management across the state while advancing safer, smarter infrastructure solutions.

Blog

Event Recap: YES Week 2026

YES Week returns! WGI celebrated its 54th Year of Exceptional Service by transforming offices across the country into “Area 54” during YES Week 2026.

Blog

Event Recap: The DBIA-SE Conference

WGI recently joined industry leaders and project owners at the 2026 DBIA Southeast Region Conference in Asheville, North Carolina, to explore the evolving future of Alternative Delivery. Learn more about how the event highlighted how innovation and partnership continue to shape successful infrastructure projects.

JOIN THE TEAM

You’ve been searching for a place like WGI. We look forward to meeting you soon.

We're
Nearby

Enter your zip code, and we’ll personalize your experience with local projects, office locations, team members, and more.

WGI's success starts with our Associates

WGI supports its associates with meaningful opportunities for growth, strong benefits and perks, while we work collaboratively with clients and co-consultants to shape and improve communities.

Our Team in Action

Join the Team

WGI is a dynamic organization with opportunities nationwide for engineers, land surveyors, landscape architects, environmental scientists, and architects.

Find a team member:

Let's talk about your next project.