Toll Free:

WGI PROJECT

10 & 120 South Riverside Plaza Evaluation and Restoration

Location:
Chicago, IL
Project Size:
165,000 SF

Project Description

WGI completed and extensive evaluation of the structures that included the plazas, docks, sidewalks, and plenum space above the railroad tracks in a high traffic area near Union Station in downtown Chicago.

Recommendations were made for repairs to the structure as well as waterproofing protection. WGI designed and implemented all phases of this project. The work required careful phasing to maintain pedestrian traffic flow to, and around, the building during construction. Following waterproofing repairs, a new planter and paving system was installed as an architectural enhancement, providing additional green space, and seating along the riverfront property.

The project included:

  • Full replacement of the building perimeter plaza systems
  • Isolated but significant structural distress discovered
  • Unforseen buried conditions exposed during the work
  • Temporary decks built for restaurant dining during construction
  • Nighttime and weekend work
  • Coordination with Amtrak for property access

Project Gallery

Related Projects

We're
Nearby

Enter your zip code, and we’ll personalize your experience with local projects, office locations, team members, and more.

WGI's success starts with our Associates

WGI supports its associates with meaningful opportunities for growth, strong benefits and perks, while we work collaboratively with clients and co-consultants to shape and improve communities.

Our Team in Action

Join the Team

WGI is a dynamic organization with opportunities nationwide for engineers, land surveyors, landscape architects, environmental scientists, and architects.

Awesome Associates – Raul Villarreal (Chicago, IL)

Meet our Awesome Associate Raul Villarreal, a Junior SUE Crew Chief from our Chicago office.

Our Leadership

Find a team member:

Let's talk about your next project.