As a part of Lake Worth Drainage District’s on-going canal maintenance program, the L-38 canal system was reshaped to the required design selection to maximize drainage capacity. Canal bank slope protection was provided to stabilize and maintain the optimal flow area with precast articulate concrete mats that bidirectionally insure continuity.
WGI’s Structures staff prepared the plans, including sizing the mats to minimize canal bank scour. Our construction team also monitored the installation of the mats for the district.
Enter your zip code, and we’ll personalize your experience with local projects, office locations, team members, and more.
WGI supports its associates with meaningful opportunities for growth, strong benefits and perks, while we work collaboratively with clients and co-consultants to shape and improve communities.






WGI is a dynamic organization with opportunities nationwide for engineers, land surveyors, landscape architects, environmental scientists, and architects.