fbpx

WGI PROJECT

Flagler Memorial Bridge Replacement

Client:
FDOT - District 4
Location:
Palm Beach, FL

Project Description

This high-profile project of the northernmost of only three bridges that connect West Palm Beach over the Intracoastal to the island of Palm Beach involved replacement of the existing Flagler Memorial Bridge with a new four-lane divided urban section bridge.

Traffic barrier-separated sidewalks were included along both sides of the new bridge with a pedestrian/bicycle railing on the outside of the sidewalks. Additionally, the existing bridge overpass at Flagler Drive and SR A1A was eliminated and replaced with an at-grade signalized intersection.

The utility design portion of the project included the redesign and replacement of existing gravity sanitary sewer along a portion of the corridor, and utility service to a new bridgetender house.

Project Gallery

Related Projects

We're
Nearby

Enter your zip code, and we’ll personalize your experience with local projects, office locations, team members, and more.

WGI's success starts with our Associates

WGI supports its associates with meaningful opportunities for growth, strong benefits and perks, while we work collaboratively with clients and co-consultants to shape and improve communities.

Our Team in Action

Join the Team

WGI is a dynamic organization with opportunities nationwide for engineers, land surveyors, landscape architects, environmental scientists, and architects.

Our Leadership

Find a team member:

Let's talk about your next project.