Toll Free:

WGI PROJECT

Jupiter Riverwalk Lagoon Bridge

Client:
Town of Jupiter
Location:
Jupiter, FL

Project Description

WGI completed the design work and construction phase services for the 776-foot long walkway along the Intracoastal Waterway in Jupiter. A set of construction documents and specifications for the structural components of the bridge were prepared for the Town. The bridge was designed utilizing prestressed piles with a precast superstructure. The design services for this project also included a tie-in to the existing sidewalk and the existing Riverwalk bridge. Construction phase services included review of all shop drawings, site visits, attendance at progress meetings, and final inspections and reports.

Project Gallery

Related Projects