WGI PROJECT

Jupiter Riverwalk Lagoon Bridge

Client:
Town of Jupiter
Location:
Jupiter, FL

Project Description

WGI completed the design work and construction phase services for the 776-foot long walkway along the Intracoastal Waterway in Jupiter. A set of construction documents and specifications for the structural components of the bridge were prepared for the Town. The bridge was designed utilizing prestressed piles with a precast superstructure. The design services for this project also included a tie-in to the existing sidewalk and the existing Riverwalk bridge. Construction phase services included review of all shop drawings, site visits, attendance at progress meetings, and final inspections and reports.

Project Gallery

Related Projects

We're
Nearby

Enter your zip code, and we’ll personalize your experience with local projects, office locations, team members, and more.

WGI's success starts with our Associates

WGI supports its associates with meaningful opportunities for growth, strong benefits and perks, while we work collaboratively with clients and co-consultants to shape and improve communities.

Our Team in Action

Join the Team

WGI is a dynamic organization with opportunities nationwide for engineers, land surveyors, landscape architects, environmental scientists, and architects.