Markets
Services
Stay Connected
Sign up to receive emails to hear our latest news and achievements in our monthly newsletter.
On October 15, 2014, an extreme rain event occurred in Palm Beach. As a result, the Mar-a-Lago property was flooded. The flooding caused the existing seawall (constructed initially during the Meriwether-Post occupation of the residence) to fail along the southern section. WGI was contracted to design the reconstruction for the wall. Due to the historical significance of the property, the proposed design had to match the existing aesthetic. This was accomplished with Steel H Piles (due to the underlying limestone), precast concrete panels, and a facing wall to match the remaining walls adjacent to the failed area.
Sign up to receive emails to hear our latest news and achievements in our monthly newsletter.
Enter your zip code, and we’ll personalize your experience with local projects, office locations, team members, and more.
WGI supports its associates with meaningful opportunities for growth, strong benefits and perks, while we work collaboratively with clients and co-consultants to shape and improve communities.
WGI is a dynamic organization with opportunities nationwide for engineers, land surveyors, landscape architects, environmental scientists, and architects.