Project Details
Talquin Transmission Line
In order to properly rectify LiDAR data, WGI was tasked with establishing an accurate horizontal and vertical control network along the Talquin Transmission Line from Havana to Tallahassee (approximately 14 miles). Additionally, Photo ID points were collected and auxiliary control was established at various substations along the route.
Client :
Awards:
Project Size:
±14 Miles
Project Gallery
Related
Projects





