New downtown office tower could rise 37 stories on coveted block
By Marissa Luck – Staff Writer, Austin Business Journal Click here to view the original article New details have surfaced about a roughly 37-story skyscraper
Learn from award-winning professionals — explore our whitepapers, blogs, and the latest industry updates.
Join our dynamic organization of engineers, land surveyors, landscape architects, environmental scientists, and architects!
Talk to a market leader today! We’ll answer any questions you have about our professional services.
Determining access locations and the necessary configuration of each driveway (i.e., full-access or right-in-right-out, etc.), and assessing whether a right- or left-turn lane may be warranted & feasible must be done early as part of a new projects Traffic Impact Analysis (TIA). Having these critical items nailed down will eliminate the need for unnecessary downstream updates to the TIA that could result in added time and cost to the permitting process.
Read on for some tips for making informed decisions about access as we look at the topic through the lens of adherence to code, safety, and feasibility.
Every jurisdiction has unique requirements for minimum driveway spacing and the number of access points that will be permitted along a site’s frontage. It is vitally important to first identify the maintaining agency of the roadway onto which you are taking access.
For example, in the City of Austin, Texas, and Travis County ETJ, the maximum number of allowable site access points is dependent upon the length of the property street frontage. Minimum spacing to other driveways or intersections is dependent on the type of street (or Street Level) and whether it is a Minor or Major driveway.
In unincorporated Travis County, per Code of Ordinances 482.302.g.3.D: “…multiple driveways for single lots should be spaced no closer than 100’ center-to-center on shoulder section roadways and no closer than 50’ center-to-center on curb and gutter section roadways.” Throughout Texas, the driveway spacing requirements are different, and having this knowledge before breaking ground will allow for more convenience.
These minimums are typically flanked by a series of other restrictions and criteria, like when a site plan may provide direct access from a major roadway and when an additional emergency access point is required.
WGI will utilize its intimate familiarity with the nuances of the permitting process to help you make early decisions about the viability of the site and your project. WGI’s experts have a deep understanding of the irregularities between jurisdictions, and this knowledge can help maximize your chances of approval.
Proper access management minimizes conflicts and makes the roadway safer for all users—including the eventual users of your development project.
The following basic questions provide a good starting point as they commonly come to light during TIA analysis and review. A proactive approach to answering these questions will result in a more thoughtful, streamlined design:
Reach out to WGI for a more detailed checklist to have handy when assessing access and determining the need for turn lanes!
Site constraints such as limited frontage, drainage features, etc., can restrict driveway placement. Fear not—your project isn’t doomed if site constraints prevent driveway requirements from being met. However, it is important to understand these constraints early so that you can make any driveway location changes if other compliant options exist, or you can sufficiently defend your design if they do not.
Are you working on a development project in Texas or beyond and want to learn more about how you can provide code-driven, safe, and feasible access for your site? Our mobility experts can help! Contact us today!
WGI is a national design and professional services firm leading in technology-based solutions for the construction of public infrastructure and real estate development. At WGI, we’re providing Tomorrow’s Infrastructure Solutions Today.
By Marissa Luck – Staff Writer, Austin Business Journal Click here to view the original article New details have surfaced about a roughly 37-story skyscraper
WGI was ranked in the top 200 for the tenth consecutive year by Engineering News-Record (ENR) on their Top 500 Design Firms List for 2024.
Depending on your jurisdiction, handling the drainage of water from parking structures can be a tricky proposition. WGI can help.
Strategies for a Healthier Parking Facility. Promote public health and protect patrons with these operational management strategies.
If you are looking to start a new development project in the City of Austin, there is a new impact fee that you should be aware of. Our experts break it down for you.
At WGI, we’ll help your community develop integrated micromobility plans and policies to capture benefits, limit risks and expand choices. From pilot project design to overall mobility planning, we can help you test, scale and incorporate innovative transportation into your community plans.
You’ve been searching for a place like WGI. We look forward to meeting you soon.
Sign up to receive emails to hear our latest news and achievements in our monthly newsletter.
Enter your zip code, and we’ll personalize your experience with local projects, office locations, team members, and more.
WGI supports its associates with meaningful opportunities for growth, strong benefits and perks, while we work collaboratively with clients and co-consultants to shape and improve communities.
WGI is a dynamic organization with opportunities nationwide for engineers, land surveyors, landscape architects, environmental scientists, and architects.