WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Engineer's Opinion of Probable Remaining Construction Costs

Client:
South Florida Water Management District (SFWMD)
Market:
Water & Environment, Stormwater Management
Location:
Broward, FL

Project Details

The S-151 Structure Replacement and Automation project is located in Water Conservation Area (WCA) 3A at the intersection of the Miami Canal (C 304) and L-67A Canal, which is approximately 6 miles southwest of the S-9 Pump Station and Everglades Holiday Park.

The project consisted of removing six (6) 7 feet diameter by 98 feet long corrugated metal pipes, along with the existing wood deck structure, existing gates, fencing, stilling wells, staff gauges, and rain gauge as indicated in the contract drawings. The new structure consisted of four (4) cast-in-place concrete 8 feet wide by 8 feet high by 36 feet long box culverts with wing walls, stop log concrete recess, remote controlled stainless-steel gates, stilling wells, relocation of existing staff gauges, concrete platforms, LP Tank, fencing, gates, and new precast control building for system controls and generator. The project components were in varying stages of completion.

WGI provided assessment and development of EOPRCC services to SFWMD as an Attorney Work Project to document construction contract deficiencies. The survey and structural assessment documented the as-built condition of work in place and developed an estimate of the remaining scope of work to complete the project contract documents. In addition, repair work to correct items not constructed in compliance with the contract documents was quantified and estimated.

WGI’s Geospatial, Civil, and Structural Engineering Team, including Electrical and Instrumentation Engineering (EIE), reviewed the drawings, Final Design Engineers Opinion of Probable Construction Cost (DEOPCC), specifications, and other data (provided by SFWMD). The Team visited the site, observed the construction limits, including the access road, levee, and canal systems, and photographed the construction areas to establish a benchmark of remaining construction and repair work required to complete the contracted scope of services.

Project at a Glance

  • Engineer's Opinion of Probable Remaining Construction Costs — image 1
  • Engineer's Opinion of Probable Remaining Construction Costs — image 2

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.