WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Lift Station 87 Force Main and Lift Station 58A Force Main

Client:
City of Delray Beach
Market:
Water & Environment, Water & Wastewater Utility
Location:
Delray Beach, FL

Project Details

WGI provided analysis and design services for two portions of the City’s sanitary sewer collection system. The primary scope was to analyze six lift stations and interconnecting force mains to reduce system inefficiencies, eliminate re-pumping, and improve the system’s overall performance. WGI prepared a Lift Station Hydraulics Report that utilized existing and design flow data, analyzed static head characteristics, calculated dynamic head, and analyzed results to prepare construction documents for the proposed improvements. The improvements included the installation of a new force main to redirect flows and upgraded pumps, impellers, power supply, and control panels. The secondary scope was to replace a 1,400 LF section of deteriorating force main along Military Trail and included a horizontal directional drill parallel to an open cut across Military Trail.

Project Highlights:

• Overnight Construction Services
• Elimination of System Re-pumping
• Utility Coordination
• Retrofitting Existing Wet-wells for New Lift Station Equipment
• Open-cut and Trenchless Utility Installation

Project at a Glance

  • Lift Station 87 Force Main and Lift Station 58A Force Main — image 1

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.