
WGI PROJECT
Piedmont Improvement Project (PIP) – CP Bowers to CP Lake
Location:
Davidson County, NC
Project Description
WGI provided construction oversight services for the Piedmont Improvement Project (PIP).
Observation of second mainline track; control point, grade separation (rail and roadway), rail bridge, and culvert extension construction; control point retirement; grade crossing closings; and existing arch culvert and rail bridge modifications for the PIP – CP Bowers to CP Lake (“B2L” NCDOT TIP C-4901A,B&C)