PTI Airport Elevated Roadway Restoration
WGI conducted an engineering condition assessment of the elevated roadway and short-term parking area for the Piedmont Triad International Airport. The review included visual observations aided by limited non-destructive testing to determine deterioration areas, including cracking, scaling, spalling, and failed or damaged waterproofing items. WGI provided recommendations for a repair program to take into consideration long-term durability. Phase 1 renovations consisted of precast tee repairs, expansion joint replacement, and the installation of a heavy-duty traffic bearing membrane at the elevated roadway. The project was completed on time and within budget.
PROJECT HIGHLIGHTS
• Elevated roadway and expansion joint repairs and replacement
• Structural repairs
• Traffic bearing installation