WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

S7 and S8 Pump Station Refurbishment Project, Laser Scanning, and Structural Assessment

Client:
South Florida Water Management District (SFWMD)
Market:
Water & Environment, Water & Wastewater Utility
Location:
Broward County, FL

Project Details

South Florida Water Management District (SFWMD) selected WGI to perform a 3D Laser Scan Survey and Structural Assessment of Pump Stations S-7 and S-8 to support the pump station refurbishment design.  

The S-8 Pump Station is located about 30 miles southwest of Belle Glade and 15 miles west of U.S. Highway 27 at the Palm Beach and Broward County line.  

The S-7 Pump Station is located about 26 miles south of Belle Glade and east of U.S. Highway 27 at the Palm Beach and Broward County line.  

WGI reviewed the original structural drawings of the pump stations and previous Structural Inspection Program reports to obtain background and history for each pump station.  

After reviewing the history, WGI provided a high-definition 3D (x,y,z) Laser Scan of each of the project’s water control structures and a multi-beam hydrographic survey of the submerged areas adjacent to structures S-7 and S-8.  

WGI also provided engineering services and a field condition assessment to the SFWMD Pump Stations S-7 and S-8 and presented findings and recommendations for repairs, upgrades, or replacements.  

The building’s assessment was based on the current 2017 Florida Building Code design standards for a Risk Category IV facility.

Project Cost $77,000.00

Project at a Glance

  • S7 and S8 Pump Station Refurbishment Project, Laser Scanning, and Structural Assessment — image 1
  • S7 and S8 Pump Station Refurbishment Project, Laser Scanning, and Structural Assessment — image 2

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.