WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

San Antonio Water System Central Sewershed Package 5

Client:
San Antonio Water System (SAWS)
Market:
Water & Environment, Water & Wastewater Utility
Location:
San Antonio, TX

Project Details

WGI is the prime design firm for the Central Sewer Shed Package 5 project to reduce Sanitary Sewer Overflows (as part of the Consent Decree) by rehabilitating and replacing sanitary sewer lines with condition and capacity constraints throughout central San Antonio. Sewershed Package 5 includes three work site packages with 18,000 linear feet of CIPP, pipe bursting/bore, and open cut ranging from six- to 21-inch diameter pipe, totaling an estimated $4.2M in construction. Edgar served as a design task leader for the CIPP package, which included field investigations, review of CCTV, as-builts, block maps, record drawings, and preliminary data from the Basin Planning Consultant teams. Edgar and the design team utilized this data to verify the most effective rehabilitation method and identify potential constructability issues for the multiple sites. Design plans for CIPP segments included traffic control plans (TCP) for commercial and residential areas and included coordination with CoSA/TxDOT for work in their respective ROW. Agency coordination and stakeholder outreach was essential to ensure all impacted parties were aware of design improvements and how they were affected by the proposed improvements.

Additionally, bypass pumping layouts were evaluated, discussed in coordination with bypass pumping contractors and vendors, and incorporated within the proposed TCP. The proposed design packages for CIPP, Pipe Bursting/Bore, and Open Cut are scheduled to be completed in early 2020, with bid phase slated for the summer of 2020.

Project at a Glance

  • San Antonio Water System Central Sewershed Package 5 — image 1

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.