WGI was responsible for completing three miles of route survey and several sketches and legal descriptions for a temporary construction easement to accommodate a new regional wastewater force main and lift station for the City of Boynton Beach.
This new force main, which is approximately four miles long, provides an emergency bypass if the existing force main fails. The regional lift station wet well is being designed for an ultimate flow of 3,000 gpm as a triplex station. The pumps are designed for the current flow of 1,150 gpm utilizing two lower horsepower pumps in a duplex arrangement.