WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

Immokalee Seminole Indian Reservation Stormwater Master Planning

Client:
Singhofen & Associates, Inc.
Market:
Water & Environment, Stormwater Management
Location:
Immokalee, FL

Project Details

Seminole Tribe of Florida’s (STOF) Immokalee Reservation comprises approximately one (1) square mile with various land use designations, including agricultural, commercial, governmental, communal, educational, cultural, residential, and other uses. STOF required the development of a comprehensive stormwater management master plan (Stormwater Master Plan) to improve the area’s drainage.

The study area included the entire Reservation and the STOF Trust Property along the south side of Stockade Road; however, in some locations, the Reservation/STOF Trust Property boundary did not coincide with a hydrologic boundary, and in those cases, the study area boundary extended beyond the Reservation/STOF Trust Property to include relevant basins, water bodies and water control structures/facilities that affect drainage/flooding conditions within the Reservation/STOF Trust Property as well as the full extent of any basins that contribute stormwater flow to the Reservation/STOF Trust Property.

WGI worked with STOF to gain access to tribal lands during the pandemic, where outside consultants were not allowed. WGI crews followed all safety protocols that were in place and signed in daily.

WGI made numerous visits to the site to selective gather data at the request of the Engineer of Record (EOR). Survey crews located over 600 points for drainage structures, cross-sections, finished floor elevations, borings, and seasonal water line marks. The drainage included a dozen control structures, 50+ culverts, and 100 invert measurements. The water line marks were determined by WGI environmental scientists and later located by WGI survey crews.

The deliverable to the client and STOF involved a detailed data report and photo documentation of each feature, including an AutoCAD file.

Project Highlights:

  • Remote access
  • Right-of-entry permission

Project at a Glance

  • Immokalee Seminole Indian Reservation Stormwater Master Planning — image 1

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.