WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

CEI Services For City Marina

Client:
City of Delray Beach
Market:
Marine & Coastal
Location:
Delray Beach, FL

Project Details

WGI performed construction administration related to the improvements of the City of Delray Beach Marina. The improvements included raising and repairing structural damage to the existing seawall, the installation of new floating docks, enhancements of the surrounding walkways and sidewalks to accommodate for Americans with Disabilities Act (ADA) compliance, and provide improvements to the electrical, water/ sewer, lighting, landscaping and irrigation, security, and stormwater components.

Services performed included general administration of the construction contract, fulltime inspection, conducting meetings, review of contractor submittals, pay applications, and change orders. WGI also reviewed the construction for substantial completion and final acceptance, reviewed the contractor-submitted record drawings, and assisted the City with the close-out procedures for construction and regulatory permits.

WGI was also tasked with developing a methodology to allow existing utilities to remain in place during the construction period by utilizing jet grouting technology (soil enhancement) upland, then a concrete facing for longevity steel sheet pile placed upland faced with concrete for uniformity and additional protection. Steady sea level rise has historically inundated the streets and threatened existing residents. Due to the raised seawall height, WGI sited and designed a below-grade pump station structure and replumbed the existing drainage system to accommodate drainage during construction and in its finished state.

WGI included an initial structural and geotechnical assessment report. Disciplines involved included civil, mechanical, structural, landscape, and public outreach. Construction documents were submitted to the City at 30%, 60%, 90%, and 100% permitting bidding and construction administration, and project close-out.

Project Highlights

  • State-of-the-Art Floating Dock System
  • Upgraded Water Service
  • Individual and Public Accessible Vacuum Sewer Pump-Out Stations
  • Electrical Upgrades and Communications Services
  • ADA Accessible Walkways
  • Security Fencing
  • Signage and Striping Upgrades

Project at a Glance

  • CEI Services For City Marina — image 1
  • CEI Services For City Marina — image 2

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.