WGI provided consulting services to the City of Naperville to act as their Owner’s Representative for the review of the functional and structural design and construction of the six-level precast parking deck in the Water Street District of Naperville. The construction review included the assessment of construction costs, change orders and applications for payment.
Project Highlights:
Design Review of:
• Functional review: Layout, circulation, traffic geometry, accessibility
• Durability review for service life, maintenance, and life cycle costs
• General conformance with City’s goals, building codes, and quality design
• Review of floor slopes and drainage
• Structural review of drawings, specifications, and calculations
• General review of MEP and FP systems
Construction Review of:
• Shop drawings, RFI’s, geotechnical and material testing reports
• Participated in project meetings
• Mock-ups and production at precast concrete fabrication plant
• Site observation of the progress and quality of work
• Site observation reports and memorandum regarding project progress
• Change order requests and applications for payment
• Punchlist, as-built drawings, warranties, and other close-out documents
• 11-month warranty review