WGI Icon_Green (1)
WGI Projects
Project Experience

Learn more about successful projects from some of our clients.

Plan Your Next Project!

Kick-start your next project with this quick step-by-step intake form.
About
WGI

WGI is a national design firm creatively transforming infrastructure and real estate through tech-driven services.

Our
Locations

You’ve seen our award-winning team, proven expertise, and industry authority. Now let’s make your next project a success.

Meet Our
Leadership Team

Our Executive Leadership Team and Practice Area Leaders bring decades of experience and client successes to your next project.

Our Practice Area Leadership

Our nationwide team of engineers, surveyors, planners, and architects offers
market-leading experience.

Firm Registrations

WGI holds nationwide registrations to perform engineering, surveying, architecture, and environmental science services.
WGI
Insights Blog

Our blog covers client interests like infrastructure, real estate, regulations, and smart, connected communities.

Whitepapers & Publications

Our whitepapers highlight our design experts' innovative insights and best practices for the AEC industry.

News &
Press Releases

Dedicated to your success, we invite you to subscribe to our newsletter for the latest news, case studies, and insights.

WGI
Media Room

Our passionate design professionals frequently share their expertise at webinars and virtual events.

I-4 (SR 400) at SR 559 Interchange Improvements Design-Build

Client:
Florida Department of Transportation - District 1
Market:
Transportation, Highways, Roadways & Bridges, New Mobility & Autonomous Vehicles
Location:
Polk County, FL

Project Details

This design-build project reconstructed the SR 559 bridge over I-4. It realigned I-4 eastbound to accommodate a wider median for a future high-speed rail corridor. SR 559 and the interchange ramps were reconstructed to a higher profile to accommodate vertical clearance for the future rail corridor. SR 559 was widened from a two-lane rural roadway to a four-lane divided urban typical section within the limits of the interchange reconstruction.

A critical component of the project was coordination with FGT on relocation of a 12 inch gas main within the interchange reconstruction limits. Based on coordination with Polk County’s concurrent improvements to CR 559A, the project also included realignment of Bay Lake Connector and construction of a new jug handle u-turn to accommodate high volume truck traffic accessing the truck stop. New interchange lighting was installed to improve safety and nighttime visibility

Project Cost $21,000,000.00

Project at a Glance

  • I-4 (SR 400) at SR 559 Interchange Improvements Design-Build — image 1

Contact Our Team About Your Next Project.

At WGI, we creatively transform how our world is envisioned, designed, and experienced. Our expert team of professional engineers is ready to help.